Acessibilidade / Reportar erro

Investment recovery period in electric motor of higher efficiency in pumping for irrigation

Período de recuperação do capital investido em motor elétrico de melhor rendimento no bombeamento para irrigação

In this study, it was adjusted a mathematical model to measure the effect of electric motor efficiency on pumping system costs for irrigation on the tariff structure of conventional electricity and green horo-seasonal , and also to calculate the recovery period of the invested capital in higher efficiency equipment. Then, it was applied to a center pivot irrigation system in two options of electric motor efficiency, 92,6% (standard line) and 94,3% (high efficiency line), and the acquisition cost of the first corresponded to 70% the of the second. The power of the electric motor was 100hp. The results showed that the model allowed us to evaluate if a high efficiency motor was economically viable compared to the standard motor in each tariff structure. The high efficiency motor was not viable in the two tariff structures. In the green horo-seasonal tariff, would only be viable if its efficiency was 4.46% higher than the standard motor. In the conventional tariff, it would only be viable if the efficiency overcame 2.71%.

conventional tariff; green horo-seasonal tariff; high efficiency


Associação Brasileira de Engenharia Agrícola SBEA - Associação Brasileira de Engenharia Agrícola, Departamento de Engenharia e Ciências Exatas FCAV/UNESP, Prof. Paulo Donato Castellane, km 5, 14884.900 | Jaboticabal - SP, Tel./Fax: +55 16 3209 7619 - Jaboticabal - SP - Brazil
E-mail: revistasbea@sbea.org.br