Setups |
Carryover |
x |
|
x |
x |
x |
x |
x |
|
|
Crossover |
x |
|
x |
|
|
|
|
|
|
Non-triangular |
|
|
|
|
|
|
|
x |
|
Pre-defined sequences |
x |
|
|
|
x |
|
|
|
|
Family Setups |
x |
x |
x |
x |
|
|
x |
x |
x |
Resources |
Interm. Buffers |
|
x |
x |
x |
|
|
|
|
|
Scarce Resources |
x |
|
|
|
|
|
|
|
|
Varible Prod. Rates |
|
|
|
|
x |
|
|
|
|
Synchron. |
Between stages |
x |
x |
|
|
x |
x |
|
|
|
Product |
Perishability |
|
|
|
x |
|
|
|
|
|
Lot sizes |
|
x |
x |
|
|
|
|
x |
|
Models |
CLSD-type GLSP-type |
Almada-Lobo et al., 20071 ALMADA-LOBO B, KLABJAN D, OLIVEIRA JF & CARRAVILLA MA. 2007. Single machine multi-product capacitated lot sizing with sequence-dependent setups. International Journal of Production Research, 45(20): 4873-4894.
|
Maldonado et al., 201433 MALDONADO M, RANGEL S & FERREIRA D. 2014. A study of different subsequence elimination strategies for the soft drink production planning. Journal of Applied Research and Technology, 12(4): 631-641.
|
Kopanos et al., 201131 KOPANOS GM, PUIGJANER L & GEORGIADIS MC. 2011. Production scheduling in multiproduct multistage semicontinuous food processes. Industrial & Engineering Chemistry Research, 50(10): 6316-6324.
|
Kopanos et al., 201131 KOPANOS GM, PUIGJANER L & GEORGIADIS MC. 2011. Production scheduling in multiproduct multistage semicontinuous food processes. Industrial & Engineering Chemistry Research, 50(10): 6316-6324.
|
Santos and Almada-Lobo, 201240 SANTOS MO & ALMADA-LOBO B. 2012. Integrated pulp and paper mill planning and scheduling. Computers and Industrial Engineering, 63(1): 1-12.
|
Camargo et al., 201411 CAMARGO VC, TOLEDO FM & ALMADA-LOBO B. 2014. Hops - hamming-oriented partition search for production planning in the spinning industry. European Journal of Operational Research, 234(1): 266-277.
|
Araujo and Clark, 20136 ARAUJO SA & CLARK A. 2013. A priori reformulations for joint rolling-horizon scheduling of materials processing and lot-sizing problem. Computers and Industrial Engineering, 65(4): 577-585.
|
Clark et al., 201014 CLARK A, MORABITO R & TOSO E. 2010. Production setup-sequencing and lot-sizing at an animal nutrition plant through atsp subtour elimination and patching. Journal of Scheduling, 13(2): 111-121.
|
|
Almada-Lobo et al., 20102 ALMADA-LOBO B, KLABJAN D, CARRAVILLA MA & OLIVEIRA JF. 2010. Multiple machine continuous setup lotsizing with sequence-dependent setups. Computational Optimization and Applications, 47(3): 529-552.
|
Ferreira et al., 201218 FERREIRA D, CLARK AR, ALMADA-LOBO B & MORABITO R. 2012. Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics, 136(2): 255-265.
|
Guimarães et al., 201325 GUIMARÃES L, KLABJAN D & ALMADA-LOBO B. 2013. Pricing, relaxing and fixing under lot sizing and scheduling. European Journal of Operational Research, 230(2): 399-411.
|
Marinelli et al., 200734 MARINELLI F, NENNI M & SFORZA A. 2007. Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company. Annals of Operations Research, 150(1): 177-192.
|
Furlan et al., 201524 FURLAN M, ALMADA-LOBO B, SANTOS M & MORABITO R. 2015. Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines. Computers and Operations Research, 59: 33-50.
|
|
Araujo et al., 20077 ARAUJO SA, ARENALES MN & CLARK A. 2007. Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups. Journal of Heuristics, 13(4): 337-358.
|
Clark et al., 201416 CLARK A, MAHDIEH M & RANGEL S. 2014. Production lot sizing and scheduling with non-triangular sequence-dependent setup times. International Journal of Production Research, 52(8): 2490-2503.
|
|
|
Ferreira et al., 200917 FERREIRA D, MORABITO R & RANGEL S. 2009. Solution approaches for the soft drink integrated production lot sizing and scheduling problem. European Journal of Operational Research, 196(2): 697-706.
|
Baldo et al., 20149 BALDO TA, SANTOS MO, ALMADA-LOBO B & MORABITO R. 2014. An optimization approach for the lot sizing and scheduling problem in the brewery industry. Computers and Industrial Engineering, 72: 58-71.
|
Amorim et al., 20114 AMORIM P, ANTUNES CH & ALMADA-LOBO B. 2011. Multi-objective lot-sizing and scheduling dealing with perishability issues. Industrial & Engineering Chemistry Research, 50(6): 3371-3381.
|
|
|
Araujo et al., 20088 ARAUJO SA, ARENALES MN & CLARK AR. 2008. Lot sizing and furnace scheduling in small foundries. Computers and Operations Research, 35(3): 916-932. Part Special Issue: New Trends in Locational Analysis.
|
Toso et al., 200945 TOSO EA, MORABITO R & CLARK AR. 2009. Lot sizing and sequencing optimisation at an animal-feed plant. Computers and Industrial Engineering, 57(3): 813-821.
|
|
|
Ferreira et al., 201218 FERREIRA D, CLARK AR, ALMADA-LOBO B & MORABITO R. 2012. Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production. International Journal of Production Economics, 136(2): 255-265.
|
|
|
|
|
|
|
|
|
Toledo et al., 201444 TOLEDO CFM, DE OLIVEIRA L, DE FREITAS PEREIRA R, FRANÇA PM & MORABITO R. 2014. A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem. Computers and Operations Research, 48: 40-52.
|
|
|
|
|
|
|
|