Time for concrete casting: a new paradigm

The Brazilian standard NBR 7212 states that the time of transporting the concrete between the start of mixing should be less than 90 minutes so that by the end of the discharge is a maximum of 150 minutes. Yet often, in construction, concrete is used after this period. In order to investigate the behavior of concrete after setting time of cement was cast six concrete mixtures with two types of cement. The mixtures were produced and kept fresh for six hours, adopting a procedure for maintenance of abatement by superplasticizer and agitation. The results show that of the test piece molded over six hours of maintained or increased the compressive strength average.

start time of catching; transportation of concrete; concrete machined


IBRACON - Instituto Brasileiro do Concreto Instituto Brasileiro do Concreto (IBRACON), Av. Queiroz Filho, nº 1700 sala 407/408 Torre D, Villa Lobos Office Park, CEP 05319-000, São Paulo, SP - Brasil, Tel. (55 11) 3735-0202, Fax: (55 11) 3733-2190 - São Paulo - SP - Brazil
E-mail: arlene@ibracon.org.br