ABSTRACT
In this paper the primal-dual interior point methods are developed for the problem of minimizing losses in the generation and transmission of the predispatch of a hydroelectric power system with programmed maneuvers and spinning reserve constraints. Both aspects, the number of iterations for the method to achieve convergence and the efficient solution of the resulting linear systems in order to obtain fast iterations are discussed.
Keywords:
interior point; predispatch; linear programming